THE level crossing in Bicester is being operated by hand after a signal failure in the early hours of this morning.

Problems with a track signal were reported at 3.30am and the barrier to the crossing in London Road was closed, blocking traffic.

A member of staff began operating the barrier manually to allow traffic to pass at 7am.

A Network Rail spokesman said it did not know how long it would take to fix the signal and resume the automatic barrier.