A new path has been installed at a small park in North Abingdon.

The installation at Hillview, between Hillview Road and South Avenue, was carried out by contractors using self-binding ballast.

This long-lasting, natural material is what was used for the original path.

The path also benefited from new edging where needed.

In addition, the Ock Valley Walk path will undergo a renovation, having been affected by flooding.

It will be surfaced and edged in the same way the path at Hillview was, creating "a popular alternative route into town".

The town council manages an number of sites in the town including cemeteries.

These sites are maintained and tidied by the outdoor team, which operates seven days a week.