Here are some key numbers related to Scotland’s largest offshore wind test and demonstration facility:
£300 million – Vattenfall investment in the European Offshore Wind Deployment Centre (EOWDC).
1.5 miles – Location of the EOWDC from Aberdeen shore.
191 metres – Height of the 11 turbines.
80 metres – Length of the turbine blades.
164 metres – Size of the turbine rotor.
1,800 – Weight in tonnes of each of the turbine’s foundations.
312 GWh – The centre’s annual energy production.
Comments: Our rules
We want our comments to be a lively and valuable part of our community - a place where readers can debate and engage with the most important local issues. The ability to comment on our stories is a privilege, not a right, however, and that privilege may be withdrawn if it is abused or misused.
Please report any comments that break our rules.
Read the rules hereLast Updated:
Report this comment Cancel